JUMBLE is sailing again, although not yet very far. This post is coming to you from exotic Block Island, RI. Our plan is a shakedown cruise around New England before heading south to Florida sometime in October.
For the last two years we've been working, saving and giving JUMBLE a major overhaul in and around Greenport, NY. I'll spare you the boring details, but here's a quick list of the major items:
- Removed Bottom Paint, Gelcoat Blistering, Faired and Barrier Coated Hull
 
- Replaced Forward Cabin Roof and Beams, Added Mast Compression Beam, Removed Post
 
- Painted Topsides, Deck, Cabin
 
- Stripped and Varnished Toerail
 
- Stripped and Varnished Masts, Re-bedded Hardware and Added Dutchmen where Needed
 
- Laminated New Booms
 
- Patched and Glassed too Many Areas to Mention, Ruthlessly Eliminated Leaks/Rot
 
- Replaced All Deadlights and Portlights
 
- New Anchor Windlass, New Self-Tailing Sheet Winches
 
- Added 22 gal Water tank on Port
 
- Added Class B AIS and Navigation Computer, Rebuilt Nav Station
 
- Replaced Wiring, Changed House Bank to 4 Trojan 105s 
 
- Built Hard Companionway Dodger/Seahood
 
- Running Backstays for Mizzen and Lots of New Rigging
 
- Replaced Motor Mounts and Shaft Seal
 
- Refinished Interior Paint/Varnish (Not enough time for all of it)
 
- Built Compression/Lift-Up Hatches for Stern Deck
 
- Removed And Glassed over Thru-Hulls for Speed, Depth and an Unused Sink Drain
 
- Installed in-Hull Depth Sounder
 
- Rebuilt Salon with Double Bunk Starboard and Removable Hanging Table
 
I probably forgot some projects, but let's leave it at 20 items. Pictures tell the story better.
  | 
| Winter 2015-16 in Greenport | 
  | 
| Boats Stored for Winter | 
  | 
| JUMBLE with Hoop-Style Shrink Wrap | 
  | 
| Winter 2016 - Removing and Replacing Forward Cabin Top | 
  | 
| Spring 2016 - Working on the Bottom | 
  | 
| Summer 2016, Painting Hull and then Toerail Varnish | 
  | 
| Working in Hoop Tent | 
  | 
| Anna Helping with the Keel | 
  | 
| Fall 2016, Heading Indoors for Winter 2016-17 | 
  | 
| Our Home from July 2016 to May 2017 | 
  | 
| View from Our Place | 
  | 
| Large Dutchman on Mizzen | 
  | 
| Glassing and Re-Joining Aft of House and Companionway | 
  | 
| Large Cabin Top Patch  | 
  | 
| House Coming Together | 
  | 
| Masts Hanging for Varnish | 
  | 
| Enclosed Area Behind Anna (The only area we could heat above 60°) | 
  | 
| Gluing Booms from 2x4 Stock in Enclosure | 
  | 
| Spring 2017: JUMBLE's Finally Tastes Saltwater | 
  | 
| Scuttle (Companionway Dodger) Under Construction. Plywood Sides, Nida-Core Top | 
  | 
| Removable Hanging Table | 
  | 
| Enclosure for Navigation Computer, DC-DC Regulator, AIS and Autopilot | 
  | 
| New Navigation Setup | 
  | 
| New Beam for Mainmast. Nothing Fancy, Just a Blob of Wood | 
  | 
| Anna's Happy to be Back on the Water | 
  | 
| JUMBLE back in Three Mile Harbor, Two Years Later | 
 
Glad to see she's and you guys are back in the water and moving again
ReplyDelete